This project involves the installation of a 29 km underground power distribution system utilizing 1*185 mm² 11kVA cables. The objective is to enhance the reliability and safety of the power supply while eliminating existing overhead infrastructure. This initiative will involve constructing concrete trenches, implementing Horizontal Directional Drilling (HDD) where necessary, and removing existing power poles.